- Critical areas: Identifies areas of critical concern and works with local units of government for their wise use. (Program web site)
- Radioactive waste program: Studies issues related to storage and production of radioactive waste. (Program web site)
- Energy Facility Permitting: Permitted power plants, pipelines, and other major energy facilities (authority transferred to the Public Utilities Commission effective July 1, 2005). (Program web site)
Projects and studies
The projects below represent the work of the EQB and its programs. Not
all projects are assigned to programs. The database holds information on
EQB projects starting in 2005
Ongoing
- 38
- Pressing natural resources issues for the LCCMR: At its September 21, 2006 meeting, the Environmental Quality Board approved a report on the state's pressing natural resources issues for submission to the Legislative Citizens Commission on Minnesota Resources. (Project record)
- 2005 Energy Facility Permitting Annual Hearing: Documents from the 2005 Energy Facility Permitting Annual Hearing. No PUC docket established. . (Project record)
- 2007 Energy Facility Permitting Annual Hearing: Documents from the 2007 Energy Facility Permitting annual hearing. PUC docket number: 07-1579. . (Project record)
- 2004 Energy Facility Permitting Annual Hearing: Documents from the 2004 Energy Facility Permitting Annual Hearing. . (Project record)
- 2003 Energy Facility Permitting Annual Hearing: Documents from the 2003 Energy Facility Permitting Annual Hearing. . (Project record)
- 2002 Energy Facility Permitting Annual Hearing: Documents from the 2002 Energy Facility Permitting Annual Hearing. . (Project record)
- 2001 Energy Facility Permitting Annual Hearing: Documents from the 2001 Energy Facility Permitting Annual Hearing. . (Project record)
- 2000 Energy Facility Permitting Annual Hearing: Documents from the 2000 Energy Facility Permitting Annual Hearing. . (Project record)
- Bent Tree Wind Project 161 kV Radial Transmission Line and Substation: Wisconsin Power and Light Company (WPL) has elected to seek local review for a 161 kV transmission line and associated substation to connect the Bent Tree Wind Project to the electrical transmission grid in Freeborn County. . (Project record)
- GRE Sartell 115 kV Transmission and Substation Upgrade: Great River Energy (GRE) has elected to seek local review for new and upgraded transmission lines and substations to operate at 115 kV near the City of Sartell in Stearns County. . (Project record)
- Yankee Doodle - Pilot Knob 115 kV System Upgrade: Great River Energy, Dakota Electric Association, and Xcel Energy have elected to seek local review to upgrade existing transmission lines and substations to operate at 115 kV within the City of Eagan in Dakota County. . (Project record)
- Minnesota Power Nashwauk 115 kV Transmission Line Rerouting (09-997): Minnesota Power has elected to seek local review to reroute and reconstruct a section of 115 kV transmission line in the City of Nashwauk in Itasca County. . (Project record)
- 2008 Energy Facility Permitting Annual Hearing: Douments from the 2008 Energy Facility Permitting Annual Hearing. PUC Docket Number: 08-1426. (Project record)
- 2009 Energy Facility Permitting Annual Hearing: Documents from the 2009 Energy Facility Permitting Annual Hearing. PUC Docket Number: 09-1351. . (Project record)
- Hayward to Worth 161 kV Transmission Line Rebuild (10-224): ITC Midwest, LLC is seeking approval of a minor alteration to a 161 kV transmission line in Freeborn County. . (Project record)
- Xcel Energy Courtland Township 115 kV Transmission Line Rebuild (10-641): Xcel Energy has elected to seek local review to rebuild a section of 115 kV transmission line in Courtland Township, Nicollet County. (Project record)
- GRE Pokegama 115 kV Substation and Transmission Line (10-268): Great River Energy (GRE) has elected to seek local review for a new 115 kilovolt (kV) substation and transmission line in Itasca County. (Project record)
- SMMPA 161 kV Westside Substation System Connection (10-350): The Southern Minnesota Municipal Power Agency has elected to seek local review for a 161 kV transmission line in Olmsted County. (Project record)
- Pleasant Valley Wind Project -- Transmission and Substation Facilities (09-1198): Pleasant Valley Wind, LLC has elected to seek local review for transmission and substation facilities to connect the proposed Pleasant Valley Wind Project to the electrical transmission grid in Mower County. (Project record)
- Lakefield Junction Substation Expansion (10-618): ITC Midwest, LLC is requesting approval of a minor alteration to expand the Lakefield Junction Substation in Jackson County. (Project record)
- Xcel Energy Orono Substation Expansion (10-957): Xcel Energy has elected to seek local review to expand the existing Orono substation and connect it to the electrical transmission grid with a new 115 kV transmission line in the City of Orono in Hennepin County. (Project record)
- Elk Substation Expansion (10-1086): ITC Midwest, LLC is requesting approval of a minor alteration to expand the Elk Substation in Nobles County. (Project record)
- Worthington Public Utilities 115 kV Transmission Line Project (11-308): Worthington Public Utilities (WPU) has elected to seek local review for a new 115 kilovolt (kV) transmission line and the rebuilding of an existing 69 kV line in Nobles County. (Project record)
- SMMPA and RFPU Redwood County 115 kV Transmission Line and Substation (10-1272): Southern Minnesota Municipal Power Agency (SMMPA) and Redwood Falls Public Utilities (RFPU) have elected to seek local review for a new 115 kilovolt (kV) transmission line and substation in Redwood County. (Project record)
- Glencoe Light and Power 115 kV Transmission Line and Substation (11-162): The Glencoe Light and Power Commission (GLPC) has elected to seek local review for a new 115 kilovolt (kV) transmission line and substation in McLeod County. (Project record)
- Minnesota River integrated watershed, water quality and ecosystem restoration study: The Environmental Quality Board co-chairs this federal – state study to provide the river community with new tools for understanding how local water and land use choices affect the basin. (Project record)
- Moorhead Public Service 115 kV Transmission Line and Substation Project (11-689): Moorhead Public Service (MPS) has elected to seek local review for a new 115 kilovolt (kV) transmission line and associated substation in Clay County. (Project record)
- Norway Lake Reroute (11-857): The Western Minnesota Municipal Power Agency (WWMPA) is requesting approval of a minor alteration to reroute and rebuild a section of a 230 kV transmission line around Norway Lake in Otter Tail County. The reroute will remove the existing line from the lake. (Project record)
- Freeborn to Hayward 161 kV Transmission Line Rebuild (11-954): ITC Midwest, LLC is requesting approval of a minor alteration to rebuild the Freebon to Hayward 161 kV tranmission line in Freeborn County. (Project record)
- GRE Shoal Lake 115 kV Transmission Line and Substation Project (11-1061): Great River Energy (GRE) has elected to seek local review for a new 115 kilovolt (kV) transmission line and associated substation in Itasca County. (Project record)
- Xcel Energy Chaska 115 kV Transmission Tap Line (12-73): Xcel Energy has elected to seek local review for a new 115 kilovolt (kV) transmission line in the city of Chaska. . (Project record)
- GRE Northpoint Substation and 115 kV Transmission Line Project (12-80): Great River Energy (GRE) has elected to seek local review for a new 115 kilovolt (kV) transmission line and associated substation in the city of North Mankato. (Project record)
- Tamarac 115 kV Transmission Line Project (12-206): Tamarac Line, LLC has elected to seek local review for a new 115 kilovolt (kv) transmission line in Clay County and Otter Tail County. . (Project record)
- Minnesota Power Gilbert 115 kV Transmission Line Project (12-800): Minnesota Power has elected to seek local review for a new 115 kV transmission line in St. Louis County and the city of Gilbert. (Project record)
- Heron Lake to Lakefield Junction 161 kV Transmission Line Rebuild (12-898): ITC Midwest, LLC is requesting approval of a minor alteration to rebuild the Heron Lake to Lakefield Junction 161 kV tranmission line in Jackson County. (Project record)
- 2012 Annual Hearing (12-360): Documents related to the 2012 Power Plant Siting Act Annual Hearing. (Project record)
- Otter Tail Power Company Bemidji 115 kV Transmission Line Upgrade (12-888): Otter Tail Power Company has elected to seek local review to upgrade existing 69 kV infrastructure in the city of Bemidji. (Project record)
- Minnesota Power Silver Bay 115 kV Transmission Line and Switching Station (13-400): Minnesota Power has elected to seek local review to construct a new 115 kV transmission line and switching station in the city of Silver Bay. (Project record)
Completed
- 18
- Charting a course for the future: Report of the state water program reorganization project. (Project record)
- Mandatory review and exemption categories for recreational trails: The Environmental Quality Board must adopt mandatory EAW, EIS and exemption categories for recreational trails. (Project record)
- Study of environmental review: Evaluation of the Environmental Review Program to ensure it meets its goals in a way that balances administrative burden and public benefit. (Project record)
- Examples and Illustrations for EQB Guidance Documents and Educational Materials: Examples of environmental review documents, process diagrams, and related materials. (Project record)
- Water sustainability assessment: This assessment is used to create a framework for understanding potential constraints to future development through the routine estimation of water demand and its comparison to known supplies. (Project record)
- Airport expansion options: In March 1996, the Metropolitan Airports Commission recommended expanding the Minneapolis-St. Paul International Airport. Another option, to take no action and not expand the airport, was also considered. The Metropolitan Airports Commission completed in May 1997 an environmental impact statement for both options. (Project record)
- Water management unification initiative: Attempt to develop a 10 year framework for water management. (Project record)
- Generic Environmental Impact Statement for animal agriculture: Study of effect of feedlots. (Project record)
- Urban development generic environmental impact statement: The 1999 Minnesota Legislature directed the Environmental Quality Board to examine the long-term effects of urban development — past, present, and future — on the economy, environment and way of life of the residents of the state. (Project record)
- Amending the Environmental Review program rules – phase 1: Amendments to Environmental Review Rules effective October 30, 2006. The “Phase 1” amendments authorized for rulemaking on December 15, 2005 and adopted with modifications on June 15, 2006 by the EQB, were published in the State Register on October 23 and become effective on October 30, 2006. (Project record)
- Clean Water Cabinet: The Environmental Quality Board worked with and through Clean Water Cabinet to accomplish its water mission. (Project record)
- Amending the Environmental Review program rules - Phase 2: Amendments to Environmental Review Program Rules effective November 23, 2009. The "Phase 2" amendments, authorized for rulemaking on June 15, 2006 and adopted with modifications on June 18, 2009 by the EQB, were published in the State Register on November 16 and became effective on November 23, 2009. (Project record)
- Biennial water priorities report: Minnesota Statutes directs the Environmental Quality Board to coordinate state water programs and develop a biennial water policy and priorities report. (Project record)
- State water plan: The Environmental Quality Board is charged with initiating, coordinating, and developing a comprehensive long-range water resources planning report, to be completed every 10 years. (Project record)
- Water availability project: Enviromental Quality Board sets course for water sustainability. (Project record)
- Groundwater technical workgroup: DNR led a team of expert hydrologists to evaluate tools for sustainability. (Project record)
- Interagency water monitoring technical workgroup : An interagency group of water monitoring technical experts meets on a regular basis to ensure efficiency and interagency coordination. (Project record)
- Executive Order 11-32 projects: At its November 14, 2012 board meeting, the EQB approved recommendations for improving environmental review, recommendations for improving environmental governance and coordination, and the Minnesota Environment and Energy Report Card, in fulfillment of Executive Order 11-32. (Project record)
- 5
- Minnesota Environment and Energy Report Card: The Minnesota Environment and Energy Report Card was prepared by the EQB to fulfill the directive of Executive Order 11-32 to, “[b]y November 15,2012,…prepare an environmental and energy report card that identifies metrics which the State of Minnesota can use to measure its performance and progress protecting Minnesota's valuable air, water and land resources. Once initially established, the environment and energy report card shall be an annual report with renewed priorities, initiatives, and goals and an updated report card.”, November 21, 2012. (2.1 M, .pdf) | Report details
- Evaluation and Recommendations for Improving Environmental Review: The report, Evaluation and Recommendations for Improving Environmental Review, was prepared by the EQB to fulfill the directive of Executive Order 11-32 to, “[b]y November 15,2012,… evaluate and make recommendations on how to improve environmental review, given the changes made in Chapter 4, House File 1, and the recommendations contained in the Office of the Legislative Auditor Environmental Review and Permitting Report.”, November 21, 2012. (1.29 M, .pdf) | Report details
- Energy and Report Card Metrics Review: 10/17/2012: Energy and Report Card Metrics Review: 10/17/2012, October 17, 2012. (604.44K, .pdf) | Report details
- Report of the Citizens’ Subcommittee on the Future of the Environmental Quality Board: The EQB Citizen's Subcommittee put forth recommendations for consideration regarding the future of the Environmental Quality Board, December 21, 2010. (424.92K, .pdf) | Report details
- 2010 Minnesota Water Plan: A ten year framework for managing Minnesota's water, November 29, 2010. (15.5M, PDF) | Report details